Tenders Description & Specification for Full Scale Sewerage System
Full Scale Sewerage System
The routing of sewers is particularly important in wastewater engineering. Pipe inclinations, pipe inlets and outlet, reducers and cross-sections must be considered when designing systems, taking into account interactions between the components. In particular, the pressure distribution in complex pipe systems places high demands on design engineers. Design errors lead to noise, empty drain traps and clogged pipes.
SR 510 allows a variety of experiments in the field of wastewater engineering and enables the visualisation of flow processes in sewers.
The experimental plant includes an extensive drainage pipe system based on common real-world elements. The pipes are transparent to allow visualisation of the flow processes. The cisterns are located in the top part of the experimental plant. These are opened or closed individually via solenoid valves. In addition, the bypass, ventilation pipe and pressure flushing are equipped with solenoid valves. The solenoid valves are triggered via a remote control. The system can be used to study the flow and pressure curve at different types of junctions, pipe offsets, cross-sectional changes and drain traps under different ventilation and evacuation conditions. The system contains a closed water circuit with collection tank and pump.
There are pressure measuring points located along the downcomer to measure the pressure conditions in the wastewater system. The measuring points are connected to a tube manometer via hose connections. The flow rate is determined via a rotameter.
Technical details
Specification
experimental plant for demonstration of wastewater technology
transparent glass pipes and tanks
10 cisterns with remotely-operated solenoid valves
1 toilSR with cistern
1 toilSR with pressure flush
contains downcomer, collection pipe, ventilation pipe and bypasses
6 tube manometers to indicate the pressure curve in the downcomer
measurement of flow rate via rotameter
Technical data
Pump
power consumption: 550W
max. flow rate: 4,5m3/h
max. head: 42,6m
Collection tank
volume: approx. 300L
Transparent cisterns
4x 20L
6x 10L
Cistern
1x 9L
Flush for toilet: max. 9L
Measuring ranges
flow rate: 0,4…4L/h
pressure: 6x 1500mmWC
230V, 50Hz, 1 phase
230V, 60Hz, 1 phase
120V, 60Hz, 1 phase
UL/CSA optional
Ltekonline are the manufacturers of Full Scale Sewerage System used to demonstrate engineering principles in Engineering Colleges, Engineering Schools and Heat Transfer Lab Equipments for Engineering Teaching Lab in Universities
Categories: Heat Transfer Lab Equipments